谷歌浏览器插件
订阅小程序
在清言上使用

Optimizing VGOS Observations Using an SNR-based Scheduling Approach

arxiv(2024)

引用 0|浏览6
暂无评分
摘要
The geodetic and astrometric VLBI community is in the process of upgrading its existing infrastructure with VGOS. The primary objective of VGOS is to substantially boost the number of scans per hour for enhanced parameter estimation. However, the current observing strategy results in fewer scans than anticipated. During 2022, six 24-hour VGOS R D sessions were conducted to demonstrate a proof-of-concept aimed at addressing this shortcoming. The new observation strategy centers around a signal-to-noise (SNR)-based scheduling approach combined with eliminating existing overhead times in existing VGOS sessions. Two SNR-based scheduling approaches were tested during these sessions: one utilizing inter-/extrapolation of existing S/X source flux density models and another based on a newly derived source flux density catalog at VGOS frequencies. Both approaches proved effective, leading to a 2.3-fold increase in the number of scheduled scans per station and a 2.6-fold increase in the number of observations per station, while maintaining a high observation success rate of approximately 90-95 in the main objective of these sessions by successfully increasing the number of scans per hour. The strategies described in this work can be easily applied to operational VGOS observations. Besides outlining and discussing the observation strategy, we further provide insight into the resulting signal-to-noise ratios, and discuss the impact on the precision of the estimated geodetic parameters. Monte Carlo simulations predicted a roughly 50 increase in geodetic precision compared to operational VGOS sessions. The analysis confirmed that the formal errors in estimated station coordinates were reduced by 40-50 significant improvement, with a 40-50
更多
查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要