谷歌浏览器插件
订阅小程序
在清言上使用

First Results of AUP Nb3Sn Quadrupole Horizontal Tests

OSTI OAI (US Department of Energy Office of Scientific and Technical Information)(2024)

引用 0|浏览16
暂无评分
摘要
The Large Hadron Collider will soon undergo an upgrade to increase itsluminosity by a factor of  10 [1]. A crucial part of this upgrade will bereplacement of the NbTi focusing magnets with Nb3Sn magnets that achieve a  50increase in the field strength. This will be the first ever large-scaleimplementation of Nb3Sn magnets in a particle accelerator. The High-LuminosityLHC Upgrade, HL-LHC is a CERN project with a world-wide collaboration. It isunder construction and utilizes Nb3Sn Magnets (named MQXF) as key ingredientsto increase tenfold the integrated luminosity delivered to the CMS and ATLASexperiments in the next decade. The HL-LHC AUP is the US effort to contribute approximately 50low-beta focusing magnets and crab cavities for the HL-LHC. This paper will present the program to fabricate the Nb3Sn superconductingmagnets. We are reporting the status of the HL-LHC AUP project present theresults from horizontal tests of the first fully assembled cryo-assembly.
更多
查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要