谷歌浏览器插件
订阅小程序
在清言上使用

Design Verification Process for Subsea Oil and Gas Products

SPE DRILLING & COMPLETION(2023)

引用 0|浏览3
暂无评分
摘要
A crucial step in new product development is the design verification process (DVP), which assures that the conceptual design of new technology is successfully transformed into a prototype product. In this paper, a novel DVP for subsea electrical and electronic prototype products is introduced. The comprehensive DVP ensures that the prototype of the product is designed righteously, is well documented, and is verified according to international practices and standards such as The American Petroleum Institute (API), International Organization for Standardization, European Norm, and European Union specifications. Compliance testing [environmental stresses and electromagnetic compatibility (EMC)] on the product is proposed to achieve Technology Readiness Level 2 (TRL2) of the first article of a printed circuit board (PCB). Concerning the quality of an electronic circuit board, it is recommended in this paper to follow the guide-lines and specifications of the Institute of Printed Circuits to certify the robustness of the design. Finally, the proposed DVP is thoroughly exercised on the insulation monitoring PCB under the prescribed test methods as a case study. The experimental results show that the design is robust and the product is suitable for use in the intended subsea environment after further raising the technology maturity level of the product.
更多
查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要