谷歌浏览器插件
订阅小程序
在清言上使用

Validation and Optimization of Activity Estimates of the FiR 1 TRIGA Research Reactor Biological Shield Concrete

Nuclear science and engineering(2022)

引用 1|浏览0
暂无评分
摘要
FiR 1 is a TRIGA Mark II-type research reactor in Finland. It was in operation between 1962 to 2015 and will be dismantled in 2022 to 2023. Preliminary calculations of the activities in the reactor main structures were performed in an earlier stage of the decommissioning project. Samples of the activated parts of the reactor biological shield concrete were drilled in December 2018 to validate these estimates. This paper describes the calculations and gamma activity measurements performed for the activated concrete samples to determine the boundary between radioactive parts and concrete that can plausibly be free-released from regulatory control. The activities have been estimated with a two-step calculation process using the MCNP and ORIGEN-S calculation codes and measurements using an ISOCS gamma spectrometer with a high-purity germanium detector.
更多
查看译文
关键词
Concrete,ISOCS,TRIGA,MCNP,ORIGEN-S
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要