谷歌浏览器插件
订阅小程序
在清言上使用

Electronics integration for the GE 2 / 1 and ME 0 GEM 2 detector systems for the CMS Phase-2 Muon System 3 Upgrade

S. Butalla, M. Hohlmann

semanticscholar(2021)

引用 0|浏览5
暂无评分
摘要
The Large Hadron Collider is currently undergoing its High Luminosity upgrade, which 9 is set to increase the instantaneous luminosity by about a factor of five. Consequently, the Compact 10 Muon Solenoid experiment is upgrading its muon spectrometer to cope with the increased muon 11 flux in the forward region. The GE2/1 triple-Gas Electron Multiplier detector, which has recently 12 entered the mass production phase, and the ME0 triple-GEM detector system, which is in the late 13 prototyping phase, are undergoing electronics integration. These proceedings briefly discuss the 14 frontend electronics for the GE2/1 and ME0 detector systems, the electronics integration testing 15 process, and the future plans for the frontend electronics of these two detector systems by the CMS 16 GEM Collaboration. 17
更多
查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要