谷歌浏览器插件
订阅小程序
在清言上使用

Multi-Criteria Analysis for the Selection of the Optimal Mining Design Solution-A Case Study on Quarry "Tambura"

ENERGIES(2021)

引用 5|浏览5
暂无评分
摘要
Mining design is usually evaluated with different multiple-criteria decision-making (MCDM) methods when it comes to large open pit or underground ore mines, but it is not used on quarry sites. Since Croatia is mostly mining stone, the implementation of such methods in decision making of the quarry mine design is imperative but left out. In this paper, the PROMETHEE II and AHP decision-making methods are implemented on the quarry site to find out the best final quarry design contour. By implementing the MCDM methods, the best quarry model was chosen based on 22 different criteria parameters out of three final quarry designs. The chosen model is not only financially sound but also has the least environmental impact.
更多
查看译文
关键词
multiple-criteria decision-making methods,MCDM,PROMETHEE II,AHP,quarry,Tambura
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要