谷歌浏览器插件
订阅小程序
在清言上使用

Start-up Remanufacturing Firms’ Capacity Investment: a Two-Period Model

Annals of operation research/Annals of operations research(2021)

引用 3|浏览7
暂无评分
摘要
Time decisions of capacity investment are critical for start-up third party remanufacturers (3PR), especially when they are involved in downstream competition from their original equipment manufacturer (OEM). Considering a two-period model, we analyze 3PRs’ capacity investment timing issues by assuming their objective to be the maximization of the probability of survival. 3PRs may invest early to enjoy the first-mover advantage, or late to achieve coordination with the OEM and obtain the time value. In this paper, we first consider single 3PR setting and find that whether the 3PR invests early or late is affected by the fixed investment cost, the unit capacity cost and the recognition of the remanufactured products. However, in two competing 3PRs setting, there are three equilibriums: (1) One 3PR invests early, and the other invests late, that is, two symmetric 3PRs lead to an asymmetric equilibrium. (2) Both 3PRs invest early. (3) Both 3PRs invest late. Interestingly, we find that both 3PRs’ investing early may result in “ Prisoner’s Dilemma ”, although they can be better off by investing late simultaneously. Besides, we note that, the quantity of new products in the first period may limit the end-of-use (EOU) products which are collected for remanufacturing by the 3PRs. This motives the 3PR investing early sometimes takes first-mover the advantage to set a high capacity so as to force the other 3PR to leave the market.
更多
查看译文
关键词
Remanufacturing,Capacity investment,Start-up 3PR,Prisoner’s dilemma
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要