The efficiency of sequential accident management measures for a German PWR under prolonged SBO conditions
Nuclear Engineering and Design(2020)
摘要
•An ATHLET-CD model for a German PWR has been developed.•The model has been used for the analysis of accident management measures for a SBO.•These measures can delay core degradation onset by more than 21 h.
更多查看译文
关键词
Accident management measures,Station Blackout,PWR,ATHLET-CD
AI 理解论文
溯源树
样例
![](https://originalfileserver.aminer.cn/sys/aminer/pubs/mrt_preview.jpeg)
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要