The brief reports of the operation and developments from the autumn 2017 until summer 2018 of the Photon Factory (PF) ring and the Advanced Ring (AR) are shown. Presently for the PF, the insertion device for BL19 is replaced in this summer shutdown 2018 and the new injection septum magnet is designed and will be installed next shutdown in 2019 for the replacement of the troubled one with the cooling water pipe leakage inside of the vacuum in 2015. For the AR, the studies were conducted for the top-up user operation from next autumn and 5GeV operation to save the electricity cost and extend the user operation periods.