谷歌浏览器插件
订阅小程序
在清言上使用

Comparative Performance Evaluation for Jebba, Kainji and Shiroro Hydro Power Schemes

cellular automata for research and industry(2019)

引用 0|浏览0
暂无评分
摘要
This paper evaluates performance indices based on industry-wide practice and suggests possible approach for improving the operational efficiencies of Jebba, Kainji and Shiroro hydro power generating stations. To actualize that, data including average daily gross operating head, daily flow rate and daily energy generated were obtained from Jebba, Kainji and Shiroro power stations and the National Control Center (N.C.C.) Osogbo. From the energy (MWh) generated the average daily power generated (MW) was computed. Consequently, the average operational efficiencies of Jebba, Kainji and Shiroro hydro schemes were evaluated and found to be 89.43%, 88.45% and 94.03% respectively. Similarly, performance indicators including deemed generation, auxiliary energy consumption, availability factor, capacity index, workforce deployment, forced outage factor and scheduled outage factor were evaluated and technical inferences made. The study was limited to the year 2010 due to non-availability of data for other years.
更多
查看译文
关键词
hydro,comparative performance evaluation,kainji,power,jebba
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要