谷歌浏览器插件
订阅小程序
在清言上使用

Learning To Dispatch Operations With Intentional Delay For Re-Entrant Multiple-Chip Product Assembly Lines

SUSTAINABILITY(2018)

引用 8|浏览23
暂无评分
摘要
As the demand for small devices with embedded flash memory increases, semiconductor manufacturers have been recently focusing on producing high-capacity multiple-chip products (MCPs). Due to the frequently re-entrant lots between the die attach (DA) and wire bonding (WB) assembly stages in MCP production, increased flow time and decreased resource utilization are unavoidable. In this paper, we propose a dispatcher based on artificial neural networks, which minimizes the flow time while maintaining high utilization of resources at the same time through exploiting the possible intentional delays on DA stage. Specifically, the proposed dispatcher learns the assignment preferences between available lots and DA resources based on assembly line data generated by using a simulator, then the proposed dispatcher performs lot dispatching decisions by considering the intentional delays. The numerical experiments were performed under various configurations of the MCP assembly lines, and the results show that the proposed dispatcher outperformed the existing methods.
更多
查看译文
关键词
lot dispatching,semiconductor,assembly line,multiple-chip product,intentional delay,artificial neural network,sustainability
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要