谷歌浏览器插件
订阅小程序
在清言上使用

Myth of initial loading tritium for DEMO—Modelling of fuel system and operation scenario

Fusion Engineering and Design(2017)

引用 9|浏览1
暂无评分
摘要
•Start up of fusion plant without external source of tritium for initial loading is needed.•Realistic Power Ascension Tests (PAT) of fusion DEMO is explained and analyzed.•Typical PATs require years of operation from minimal power and pulsed power output with long dwell time.•Tritium plant is continuously operated to recover all the tritium produced by the DD and low DT burn.•Collected tritium is sufficient for the tests at virtually no additional cost or operation time.
更多
查看译文
关键词
Tritium,Initial loading,Power ascension tests,Fusion fuel cycle,DEMO
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要