谷歌浏览器插件
订阅小程序
在清言上使用

Base Cases For Assessing Risk In Transmission System Planning

2018 IEEE INTERNATIONAL CONFERENCE ON PROBABILISTIC METHODS APPLIED TO POWER SYSTEMS (PMAPS)(2018)

引用 0|浏览32
暂无评分
摘要
This paper discusses probabilistic methodology for Transmission System Planning. Recent NESCOE memo suggested that current transmission planning procedure at ISO-NE might create inconsistency within the region and between the development plans of various transmission owners. The proposed methodology establishes base cases and contingency testing as means for consistent probabilistic assessment of reliability for a proposed transmission system plan. The system stress is computed through consistent probabilistic modeling and the base cases established by systematically sampling corresponding probability distributions. The methodology is illustrated for a simplified two-zone model of the power system.
更多
查看译文
关键词
contingencies, outages, planning, probabilistic, transmission, relaxation
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要