The Status of New Fragment Separator Acculinna-2 Project and the First Day Experiments

EPJ web of conferences(2014)

引用 2|浏览38
暂无评分
摘要
The new facility fragment separator ACCULINNA-2 will be put into operation at the beginning of 2015 in FLNR JINR. The new separator is destined to add considerably to the studies of drip-line nuclei performed with the use of variety of direct reactions known to be distinctive to the 15 – 50 MeV/amu exotic secondary RIBs. Intense beams provided by the U-400M cyclotron will ensure the achievement of this objective. In addition to the RIB separation accomplished by means of the dipole-wedge-dipole selection, the addition of a zero-degree dipole magnet setup is foreseen. A long (13 m) straight section will provide precise time-of-flight measurements.