谷歌浏览器插件
订阅小程序
在清言上使用

In Situ Stress Measurements in Siliceous Mudstones at Horonobe Underground Research Laboratory, Japan

Hiroyuki Sanada, Takahiro Nakamura,Yutaka Sugita

PROCEEDINGS OF THE 13TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL REMEDIATION AND RADIOACTIVE WASTE MANAGEMENT, 2010, VOL 2(2011)

引用 4|浏览1
暂无评分
摘要
The stress measurement methods implemented during the surface-based investigations and during construction of the underground facilities in the Horonobe mudstones, as well as information on the initial stress state around the Horonobe URL, are described in this paper. During the surface-based investigations, determination of deep in situ stress was conducted using HF, BB information in deep boreholes and core-based methods such as AE and DSCA. During construction of the underground facilities, subsurface investigations utilizing CCBO, HTPF and the monitoring of spalling around the shafts were conducted in order to verify results from initial stress measurements in the surface-based investigations. HF results indicate that magnitude of the horizontal maximum and minimum principal stresses increases linearly with depth. The maximum principal stress estimated from the HF and borehole breakout data is almost E-W. This is similar to the tectonic movement direction in the vicinity of the Horonobe URL. Due to tectonic movement, horizontal maximum stress is almost 1.5 times larger than the horizontal minimum stress. The minimum horizontal principle stress is almost equivalent to overburden pressure. Stress condition determined from HTPF in the investigations during construction of the underground facilities is almost equal to the results during surface-based investigations.
更多
查看译文
关键词
In situ stress,geological disposal,Horonobe URL project
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要