谷歌浏览器插件
订阅小程序
在清言上使用

First Experimental Results from the Eu 2 Mw Coaxial Cavity Iter Gyrotron Prototype

Electron Cyclotron Emission and Electron Cyclotron Resonance Heating (EC-15)(2009)

引用 10|浏览13
暂无评分
摘要
The EU is working towards providing 2 MW, coaxial-cavity, CW, 170 GHz gyrotrons for ITER. Their design is based on results from an experimental pre-prototype tube in operation at FZK for several years, having a pulse length of several milliseconds. The first industrial prototype tube is designed for CW operation, but, in a first phase, will be tested out to Is at the European Gyrotron Test Facility in Lausanne, Switzerland as part of a phased testing/development program (1s, 60 s, CW). It is known that RF beam profile shaping, stray radiation handling, and collector cooling at these high power levels are three issues for the gyrotron. The gyrotron, magnet and body power supply have been delivered and successfully installed at the test stand, hosted by the CRPP. The main high voltage power supply delivery is delayed, so one of the power supplies dedicated to 3 of 9 gyrotrons in the TCV EC system is being used as a backup power source (all 3 TCV power sources can be interfaced with the test stand). Cathode conditioning began in November 2007 followed by collector conditioning in December. Parasitic low frequency oscillations have not hindered operation, and the tests have progressed to conditioning out to 0.14 s pulses by March 2008. During this period, the performance concerning microwave generation has been characterised and the RF beam profile has been measured at several planes to allow reconstruction of the phase and amplitude profile at the gyrotron window and to provide the necessary information permitting proper alignment of the compact RF loads prior to pulse extension. The power will be measured, according to the pulse length, using either a very-short pulse (<0.01 s) load on loan from FZK, or short-pulse (<0.2 s) or long-pulse (CW), spherical, calorimetric loads developped as part of this program by CNR. This paper presents the preliminary results of these operations.
更多
查看译文
关键词
gyrotrons,high-power microwave sources,ITER
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要