On design and development of Super-FRS main tunnel remote handling system concept
ITSC(2014)
关键词
accelerator control systems,high energy physics instrumentation computing,linear accelerators,manipulators,mobile robots,remote handling equipment,telerobotics,fair,facility of antiproton and ion research,super fragment separator,super-frs main tunnel,activated beamline inserts,automated equipment,conceptual design phase methodology,focal planes,off the shelf technologies,remote handling system conceptual design,remote handling system development,remote maintenance,remote manipulation,vacuum chambers,virtual reality simulations,remote handling,super-frs,beamline inserts,systems engineering,detectors,remote control
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要