Chrome Extension
WeChat Mini Program
Use on ChatGLM

Economic-statistical design of 2-of-2 and 2-of-3 runs rule scheme

QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL(2009)

Cited 22|Views2
No score
Abstract
In this paper, we investigate the economic-statistical design method for the 2-of-2 runs rule and the 2-of-3 runs rule. The Markov chain approach is used to obtain the average run length and the process cycle time. In addition, a simplified algorithm is presented to search the optimal setting of the design parameters. A numerical example and sensitivity analysis are also provided to compare the performances of the runs rules. The results show that the use of runs rule scheme can reduce operating cost comparing with the Shewhart control chart while maintaining a good statistical performance. Copyright (C) 2008 John Wiley & Sons, Ltd.
More
Translated text
Key words
economic-statistical design,average run length,average time to signal,runs rule,Markov chain approach
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined