Chrome Extension
WeChat Mini Program
Use on ChatGLM

New control system for nuclotron main power supplies

msra(2006)

Cited 23|Views26
No score
Abstract
The superconducting synchrotron Nuclotron was put into operation in March 1993. The Control System for the Main Magnet Power Supplies (MPSC) [1] has been operating successfully since the beginning of the first Nuclotron runs. The first experiments with the Nuclotron Beam Slow Extraction System (BES) [2] were carried out in 1999. The MPSC was upgraded at the same time for precise tuning the betatron oscillation frequency at the flattop for the slow extraction process. A new control and monitoring system for the Nuclotron main power supplies was designed in 2005 in order to substantially extend functionality of the existing equipment and software.
More
Translated text
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined