Embedding integration of temporary works with permanent works on railway projects

PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING(2023)

引用 1|浏览2
暂无评分
摘要
This paper demonstrates how UK rail-track owner Network Rail and its supply chain are working collaboratively to integrate permanent works and temporary works design and execution to improve safety, reduce error, improve efficiency and reduce greenhouse gas emissions. The work is part of Network Rail's 'health and safety by design' initiative, which aims to eliminate or reduce risks during design development for construction, operation and maintenance activities. The paper will directly benefit civil engineers using temporary works on Britain's railway network, but it can also be applied across the international building and infrastructure sector.
更多
查看译文
关键词
railway,permanent works,temporary works
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要