Chrome Extension
WeChat Mini Program
Use on ChatGLM

Wuhu Second Bridge: Development of Stayed Cable Anchorage System and Application of Structural Innovations

STRUCTURAL ENGINEERING INTERNATIONAL(2022)

Cited 0|Views2
No score
Abstract
Based on the design and construction of the second Yangtze River bridge in Wuhu (hereinafter referred to as Wuhu Second Bridge), this article introduces the structural system of a full-floating cable-stayed bridge with four cable planes, a single-column tower and separated steel box girders. A series of innovative structural measures are taken to improve the safety and economy of the bridge, such as the looping stayed cable anchorage system, the diagonal damping constraint system, and the externally prestressed segmentally assembled box girders used in the approach bridge. In addition, finite element analysis software is used to study and analyse the mechanical characteristics of the bridge. Also, the reliability of the structural anchorage system and damping constraint system is verified. Finally, the construction technology adopted for Wuhu Second Bridge is briefly described.
More
Translated text
Key words
looping stayed cable anchorage system, diagonal damping constraint system, externally prestressed segmentally assembled box girder, finite element analysis, symmetric cantilevered assembly
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined