谷歌浏览器插件
订阅小程序
在清言上使用

Rhic Beam Loss Monitor System Commissioning In Rhic Year 0 Run

BEAM INSTRUMENTATION WORKSHOP 2000(2000)

引用 2|浏览4
暂无评分
摘要
The RHIC Loss Monitor System (BLM) was successfully commissioned during the RHIC (Relativistic Heavy Ion Collider) Year 0 Run (summer of 1999). The system consists of 363 argon ionization detectors distributed around the ring. The signals are digitized in a distributed multiplexed ADC system and displayed at a 1 Hz rate in the control room. During the commissioning, the beam loss monitor system was extensively used for first turn beam steering. An impressive example of the capabilities of this system was the ability to locate a thin obstruction to within one magnet length, even though this obstruction transmitted most of the beam. With this information we were able to achieve circulating beam. This paper will discuss the RHIC beam loss monitor system design and testing. The data acquired during the RHIC commissioning run will also be presented.
更多
查看译文
关键词
beam steering,system design
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要