Design status of the ITER ECRH upper launcher mm-wave system

Fusion Engineering and Design(2009)

引用 5|浏览42
暂无评分
摘要
The purpose of the ITER electron cyclotron resonance heating (ECRH) upper launcher (UL), or antennae will be to provide localised current drive by accurately directing mm-wave beams up to 2MW, out of the four allocated upper port plugs, at chosen rational magnetic flux surfaces in order to stabilise neoclassical tearing modes (NTMs). This paper will present an overview of the UL, with emphasis on the mm-wave components. The mm-wave layout includes corrugated waveguide sections and a quasi-optical path with both focusing mirrors and plane steering mirrors. One of the essential components of the UL is the Steering Mechanism Assembly (SMA), providing variable poloidal injection angles fulfilling high deposition accuracy requirements at the plasma location. The Actuator principle and rotor bearings are frictionless and backlash free, avoiding tribological difficulties such as stickslip and seizure. The underlying working principle is the use of mechanically compliant structures. Validation and proof testing of the steering principle is achieved with an uncooled first prototype demonstrator. A second prototype is currently being manufactured, comprising the functionalities needed for the ITER compatible system such as water cooling and high power mm-wave compatibility. In order to perform the fatigue tests of the actuator bellows, a test facility has been built, under ITER-like vacuum and temperature working conditions. Results of the cyclic fatigue tests are compared to the various manufacturer standards and codes, combining stress and strain controlled material fatigue properties.
更多
查看译文
关键词
ITER,Electron cyclotron heating,ECRH,Upper port launcher,NTM,Front steering,Bellow,Flexure pivot,Compliant mechanism,Machined spring
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要