Joint scheduling of AGVs and parallel machines in an automated electrode foil production factory

Mengxi Tian, Hongyan Sang,Wenqiang Zou,Yuting Wang, Mingpeng Miao,Leilei Meng

EXPERT SYSTEMS WITH APPLICATIONS(2024)

引用 0|浏览4
暂无评分
摘要
In recent years, the automated guided vehicle (AGV) scheduling problem and parallel machine scheduling problem (PMSP) in workshops have become two hot topics in the field of operational research. In practical production, the two problems are closely related and coupled, and both play important roles in manufacturing systems. However, in the literature, the two problems are often addressed separately, which decreases the ef-ficiency of manufacturing systems to a great degree. Therefore, this paper studies the joint scheduling problem of AGV and parallel machines in a production process of automatic electrode foil. Taking makespan as the opti-mization objective, a mixed-integer linear programming model is established and verified by the GUROBI solver. A discrete gray wolf optimization algorithm is proposed to solve the AGV-PMSP. An improved NEH heuristic is used to propose the quality of the initial solution. Six neighborhood operators are used to improve the explo-ration capabilities of the proposed algorithm. A theorem is proved to improve computational efficiency. The performance of the proposed algorithm is verified using comprehensive simulation experiments.
更多
查看译文
关键词
Automated guided vehicle,Joint scheduling,Heuristics,Automated electrode foil,Discrete gray wolf optimization algorithm
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要