A stochastic bi-objective project scheduling model under failure of activities

Annals of Operations Research(2023)

引用 0|浏览1
暂无评分
摘要
In this paper, the research and development project scheduling problem ( RDPSP ) under uncertain failure of activities is formulated where an activity’s failure results in the project’s overall failure. A scenario-based bi-objective model to maximize the expected net present value ( eNPV ) and to minimize the NPV ’s risk by conditional value-at-risk ( CVaR ) measurement is presented. For this purpose, different modes of failure or success of activities have been considered as a stochastic parameter by a set of scenarios. To formulate the problem, a nonlinear model is first presented, then a mixed-integer programming ( MIP ) model of the problem is developed by piecewise approximation. Some valid inequalities are presented to improve the performance of the MIP model. A sequential sampling procedure is also used to approximate the solution of the MIP model with a large number of scenarios. The experimental results have shown that the sequential sampling procedure attains high-quality solutions in a reasonable CPU time.
更多
查看译文
关键词
R&D project scheduling,Activity failure,Conditional value-at-risk
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要