Delay Analysis of IEEE 802.11be Multi-link Operation under Finite Load
arxiv(2023)
摘要
Multi-link Operation (MLO), arguably the most disruptive feature introduced in IEEE 802.11be, will cater for delay-sensitive applications by using multiple radio interfaces concurrently. In this paper, we analyze the delay distribution of MLO under non-saturated traffic. Our results show that upgrading from legacy single-link to MLO successfully contains the $95$th percentile delay as the traffic load increases, but also that adding extra interfaces yields rapidly diminishing gains. Further experiments we conduct on Google Stadia traces, accounting for realistic traffic with batch arrivals, confirm the insights stemming from our theoretical analysis, vouching for MLO to support high-resolution real-time video with a controlled delay.
更多查看译文
关键词
Multi-link operation,IEEE 80211be,Wi-Fi 7
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要