Multi-objective optimisation of stochastic hybrid production line balancing including assembly and disassembly tasks

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH(2022)

引用 14|浏览13
暂无评分
摘要
Assembly and disassembly are important activities in the manufacturing/remanufacturing process. Although the line balancing problems of them have been extensively discussed in the existing literature, they are rarely integrated into one system. In this paper, a hybrid production line balancing problem is adopted while considering the similarity between the assembly and disassembly tasks. First, to better reflect the uncertainty existing in the actual production environment, a mathematical model of the multi-objective stochastic hybrid production line balancing problem is presented, in which task disassembly times are assumed to be random variables with known normal probability distributions. Then, a hybrid VNS-NSGA II algorithm combining variable neighbourhood search (VNS) and non-dominated sorting genetic algorithm II (NSGA II) is proposed to solve the problem. VNS is embedded into NSGA II as a local search to improve the quality of the solutions found by the NSGA II at each generation. Finally, the effectiveness of the proposed method is verified by a case study, and the superiority of hybrid production line is reflected by comparing the solutions of the independent production line with the hybrid production line. Computational comparisons demonstrate the potential benefits of the hybrid production line and the proposed method.
更多
查看译文
关键词
Hybrid production line balancing, stochastic processing time, multi-objective optimisation, Pareto optimal solutions
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要