Complex Placement Region Handling Based on Electrostatic System Modeling

2020 IEEE 15th International Conference on Solid-State & Integrated Circuit Technology (ICSICT)(2020)

引用 0|浏览2
暂无评分
摘要
With the additional fence region constraints in modern circuit designs, the VLSI placement problem has become more complex and challenging. A placement solution without considering fence region constraints may cause many problems in the legalization stage and result in an inferior placement. In this paper, we present an effective placement region handling method based on the two-dimensional electrostatic system modeling. Under the fence region constrains, we first generate multiple density maps for assigning cells to their respective fence regions. Then, we further add proper fence filler nodes to each density map, which is able to squeeze fence cells to be placed closer. The placement performance is validated through experiments on ISPD 2015 benchmarks. Experimental results show that, compared with the state-of-the-art placer NTUplace4dr, our proposed method not only reduces the wirelength by 9.9% but also achieves 5x faster runtime.
更多
查看译文
关键词
ISPD 2015 benchmark,placement region handling method,fence region constraint,modern circuit design,electrostatic system modeling,two-dimensional electrostatic system modeling,VLSI placement problem
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要