Engineering Change Order For Combinational And Sequential Design Rectification
PROCEEDINGS OF THE 2020 DESIGN, AUTOMATION & TEST IN EUROPE CONFERENCE & EXHIBITION (DATE 2020)(2020)
摘要
Engineering change order (ECO) becomes a crucial element in VLSI design flow to rectify function or fix non-functional requirements in late design stages. Even though commercial ECO solutions are available, ECO remains much room for improvement due to its high computational complexity and stringent physical restrictions. It is under active research and development. In this tutorial, we survey recent developments and list some challenges and future directions to make ECO tools more powerful and practical.
更多查看译文
关键词
engineering change order, design rectification, patch
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要