IPD Methodology in Shipbuilding

Hajnalka Vaagen, Lucky C. Masi

ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: PRODUCTION MANAGEMENT FOR THE FACTORY OF THE FUTURE, PT I(2019)

引用 1|浏览0
暂无评分
摘要
This paper proposes an Integrated Project Delivery methodology in shipbuilding from the perspective of design function, to validate with limited design knowledge whether the project can satisfy unified project goals. This is achieved by aligning real-time information flow with the design development process. The methodology is built on a systematic, multidisciplinary theoretical analysis and triangulation of methods and principles from ship design, lean construction, the collaborative BIM software, and multi-stage thinking from decision theory.
更多
查看译文
关键词
Integrated Project Delivery,Ship design,Design uncertainty,Lean construction