This paper presents a case study of a live combined heat and power (CHP) system at the author's university campus. The system comprises a 1 MWe gas engine which is operating continuously to provide electricity, as well as a heat recovery system that recovers heat from both engine jacket water and exhaust gas to provide heat to the campus. The analysis shows that the electricity generation is stable during the year but the heat recovered fluctuates considerably at different time of the year due to the different heat demand. This results in an inefficient use of the available energy. Exergy analysis is conducted for a better understanding of the components performance of the system. An absorption chiller is finally proposed to make a better utilization of the energy and the pay-back time for the chiller is found to be approximately 22 months which is economically viable. (C) 2016 The Authors. Published by Elsevier Ltd.
更多
查看译文
关键词
Combined Heat and Power,Energy efficiency,Exergy distruction
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要