OWARU: Free Space-Aware Timing-Driven Incremental Placement With Critical Path Smoothing.
IEEE Transactions on Computer-Aided Design of Integrated Circuits and Systems(2018)
摘要
This paper presents an incremental timing-driven placement tool, named OWARU. It optimizes timing critical paths through a free space-aware path smoothing: the gates on such paths are relocated to free spaces around the smoothed paths, while incremental static timing analysis is involved to accurately assess timing changes due to the relocation. OWARU is extended to accommodate gate sizing and lay...
更多查看译文
关键词
Timing,Logic gates,Smoothing methods,Optimization,Physical design,Wires,Degradation
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要