Interference-Aware Scheduling Using Geometric Constraints.

Euro-Par(2018)

引用 26|浏览20
暂无评分
摘要
The large scale parallel and distributed platforms produce a continuously increasing amount of data which have to be stored, exchanged and used by various jobs allocated on different nodes of the platform. The management of this huge communication demand is crucial for the performance of the system. Meanwhile, we have to deal with more interferences as the trend is to use a single all-purpose interconnection network. In this paper, we consider two different types of communications: the flows induced by data exchanges during computations and the flows related to Input/Output operations. We propose a general model for interference-aware scheduling, where explicit communications are replaced by external topological constraints. Specifically, we limit the interferences of both communication types by adding geometric constraints on the allocation of jobs into machines. The proposed constraints reduce implicitly the data movements by restricting the set of possible allocations for each job. We present this methodology on the case study of simple network topologies, namely the line and the ring. We propose theoretical lower and upper bounds under different assumptions with respect to the platform and jobs characteristics. The obtained results illustrate well the difficulty of the problem even on simple topologies.
更多
查看译文
关键词
constraints,interference-aware
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要