基本信息
浏览量:4
职业迁徙
个人简介
Completed projects
Optimisation of the dynamic behaviour of turnouts (PhD candidate C. Wan)
Analysis and optimisation of long-term behaviour of turnouts (PhD candidate L. Xin)
Optimisation of transition track structures for high-speed lines (PhD candidate H. Wang)
Structural health monitoring system for railway turnouts (PhD candidate X. Liu)
Wheel/rail interface probabilistic optimization based on fatigue life prediction (PhD candidate Y. Ma)
Application of new materials and elements to railway ballasted track for performance improvement. (PhD candidate Y. Guo)
Current projects
IN2ZONE (EU) - new generation go track for transition zones. WP leader. www.in2zone.eu
Sustainable development of railway ballast track And the optimizing of DEM model. (CSC/TUD, PhD candidate W. Jia)
Decision support system for S&C. (ProRail/TUD, PhD candidate J. Wegdam)
Modular design of railway crossings (ProRail/TUD). Started in 2020. To be completed in 2022.
Performance improvement of transition zones (ProRail/TUD, PDEng candidate M. Carvalho).
Decision support system for assessment of railway track quality (Fugro/TUD, PDEng candidate K. El Laham.
研究兴趣
论文共 143 篇作者统计合作学者相似作者
按年份排序按引用量排序主题筛选期刊级别筛选合作者筛选合作机构筛选
时间
引用量
主题
期刊级别
合作者
合作机构
Engineering Failure Analysispp.107977, (2024)
ENGINEERING FAILURE ANALYSIS (2024)
Construction and Building Materials (2023): 131524-131524
Construction and Building Materials (2023): 132295-132295
SSRN Electronic Journal (2023)
Transportation Geotechnics (2023): 101042-101042
Social Science Research Network (2022)
加载更多
作者统计
合作学者
合作机构
D-Core
- 合作者
- 学生
- 导师
数据免责声明
页面数据均来自互联网公开来源、合作出版商和通过AI技术自动分析结果,我们不对页面数据的有效性、准确性、正确性、可靠性、完整性和及时性做出任何承诺和保证。若有疑问,可以通过电子邮件方式联系我们:report@aminer.cn